At this moment (10:45 a.m. on Tuesday) a very long flatbed truck is being backed into the Swift Street side of Argo Cascades to unload some gigantic boulders. Another flatbed truck with a railroad tank car sized tube is awaiting its turn. This must be part of the Edison remediation of the property on the other side and the construction of exciting water features in the river.
Argo Cascades
» Want more items like this one? Visit the Stopped. Watched. page.
I thought the “exciting water features” had been postponed by EPA/DNRE – is it on again?
I did notice the water flow through Cascades was really low last Friday – wondered if it was an intentional diversion.
The story about the whitewater project postponement is here: [link]
I queried the city’s parks staff and got this email from parks & rec manager Colin Smith:
Thanks for the update, Mary!