Ann Arbor OKs Sidewalk Design, Construction

Approval of a design contract for two stretches of new sidewalk in two parts of the city – Barton Drive and Scio Church Road – has been approved by the Ann Arbor city council. Also approved at the council’s March 3, 2014 meeting was a $30,000 budget allocation for the construction of a sidewalk as part of the Ann Arbor-Saline road reconstruction project.

As part of a contract to design urgent repairs to the sanitary sewer pipes and structures in Huron Street near the intersections of Glen Street and Zina Pitcher, Fishbeck, Thompson, Carr & Huber Inc. was tapped to provide the designs for two sidewalk projects that could ultimately result in special assessments for adjoining property owners.

By way of background, its July 15, 2013 meeting, the council approved $15,000 for preliminary design of a sidewalk along Barton Drive.

Location of proposed Barton Drive sidewalk.

Location of proposed Barton Drive sidewalk.

And at its Nov. 19, 2012 meeting, the council approved $15,000 for preliminary study of a sidewalk to be constructed along Scio Church, west of Seventh Street. On Nov. 7, 2013, the council approved another $35,000 for Scio Church sidewalk design work.

Purple indicates stretches of Scio Church Road where no sidewalk exists.

Purple indicates stretches of Scio Church Road where no sidewalk exists.

The contract with Fishbeck, Thompson, Carr & Huber Inc. – which includes $50,629 for the design of the two stretches of sidewalk – would draw on that previously authorized funding.

The council also approved a $30,000 general fund expenditure to pay for a new sidewalk along the east side of Ann Arbor-Saline Road from the westbound I-94 exit ramp to the north end of the I-94 bridge, and along the west side of Ann Arbor-Saline Road from Brookfield Drive to the Michigan Dept. of Transportation (MDOT) park-and-ride commuter parking lot. The work is part of a more general road reconstruction project being handled by MDOT under an agreement between the city of Ann Arbor, the Washtenaw County road commission, MDOT and Pittsfield Township. Fishbeck, Thompson, Carr & Huber Inc. also did  design work for this project.

This brief was filed from the city council’s chambers on the second floor of city hall, located at 301 E. Huron. A more detailed report will follow: [link]