The Ann Arbor Chronicle masthead
it's like being there

Stories indexed with the term ‘construction’

Citing Economy, Board Halts Library Project

Josie Parker, Rebecca Head and Jan Barney Newman listen as other library board members discuss the decision to put the downtown building project on hold.

Josie Parker, Rebecca Head and Jan Barney Newman at Monday morning's special library board meeting.

A somber Ann Arbor District Library board voted unanimously this morning to suspend its ambitious project to build a new downtown library, though they held out the possibility of resuming the plan if and when the economy improves.

“I think we’re talking about a detour – at least I’m talking about a detour,” said board chair Rebecca Head.

The board called a special meeting for this morning which began in a closed session with the library’s real estate attorney, Jim Adams of Butzel Long. They reconvened for a public meeting at 10:15 a.m., and Head announced that Adams had delivered disturbing news about the bond market that was “very sobering.” [Full Story]

When Concrete and Water Don’t Mix

Cleaning up concrete spill

"Butter," in a red shirt, is the driver of the cement mixer truck that spilled a bit of its load. He's assisted in his cleanup effort by two workers who were radioed to come lend a hand.

When Amy Whitesall filed a Stopped. Watched. item about a concrete spill downtown, The Chronicle wondered if it would still be there by the time we hoofed it over to Huron and Fifth where the spill had occurred.

Yep, still there, but three guys from Superior Materials were attacking the pile of wet cement in the pedestrian walkway with shovels and a broom. (Superior Materials of Farmington Hills bought out Killins Concrete on the west side of Ann Arbor at Liberty and Wagoner about a year ago, but the three-man crew work out of the old Killins location). [Full Story]

Huron River Drive Reconstruction

The detour signage from Bird Hill Road leading to Huron River Drive (HRD) was still in place this morning, but the road itself was open again for business. One driver wasn’t aware that the option to turn right from Bird Hill had been restored, but it didn’t matter because she was planning to turn left anyway.

huron river drive reconstruction ann arbor

The ground cover along the shoulders of Huron River Drive is starting to sprout. The goal is that it will help stabilize the shoulders through the winter.


[Full Story]

» Text size:

larger text default text smaller text

Skyclock