The Washtenaw County B2B trail is continuing its expansion. The River Terrace trail is supposed to connect the village of Dexter with Dexter-Huron Metropark (and, eventually, Delhi Metropark), as shown here: [link]
The first stage of the River Terrace Trail to be constructed is a 0.35 mile stub leading west from Dexter-Huron metropark. This section is being constructed first so as to get Bridge #1 (as shown in the previous diagram) built before a permit expires. While the approaches are still being constructed, the bridge is in place, as shown here: [link]