Comments on: Regional Transit: Where Does Ann Arbor Fit? http://annarborchronicle.com/2013/10/16/regional-transit-where-does-ann-arbor-fit/?utm_source=rss&utm_medium=rss&utm_campaign=regional-transit-where-does-ann-arbor-fit it's like being there Tue, 16 Sep 2014 04:56:38 +0000 hourly 1 http://wordpress.org/?v=3.5.2 By: Nathanael http://annarborchronicle.com/2013/10/16/regional-transit-where-does-ann-arbor-fit/comment-page-1/#comment-278355 Nathanael Mon, 11 Nov 2013 05:46:26 +0000 http://annarborchronicle.com/?p=122550#comment-278355 Some very minor corrections to an otherwise good article.
1 – from east of Dearborn to south of Detroit, the track in the “West Detroit” area is owned by “Conrail”, not “Contrail”.
2 – The “Englewood flyover” is due to be *finished* (not started) in 2016.
3 – The new Dearborn station is now scheduled to open in 2014, not 2013.
4 – The Troy Transit Center is probably going to open in 2014 (rather than 2013) for reasons too sad and pathetic to describe.

]]>
By: Eric Boyd http://annarborchronicle.com/2013/10/16/regional-transit-where-does-ann-arbor-fit/comment-page-1/#comment-273936 Eric Boyd Thu, 17 Oct 2013 16:30:51 +0000 http://annarborchronicle.com/?p=122550#comment-273936 Interesting. (I had read the original article but not gone back and read the presentation after it was posted.)

From the slides, it looks like the chief obstacle from a WALLY perspective is that the curvature of the track as it passes over the Amtrack tracks is too sharp to allow station construction.

]]>
By: Vivienne Armentrout http://annarborchronicle.com/2013/10/16/regional-transit-where-does-ann-arbor-fit/comment-page-1/#comment-273923 Vivienne Armentrout Thu, 17 Oct 2013 15:09:44 +0000 http://annarborchronicle.com/?p=122550#comment-273923 Re (1) that was discussed at the public meeting on October 8 about likely station locations. The consultant said that this idea had been considered, but that there were numerous obstacles and it was not on the plan of favored locations for a downtown station. More information, including the meeting presentation, here: [link]

]]>
By: Eric Boyd http://annarborchronicle.com/2013/10/16/regional-transit-where-does-ann-arbor-fit/comment-page-1/#comment-273807 Eric Boyd Wed, 16 Oct 2013 22:02:13 +0000 http://annarborchronicle.com/?p=122550#comment-273807 Was there any indication whether the consultant studying locations for Ann Arbor Station will consider the intersection of the two tracks? While I could imagine this could be very expensive, it also would provide tremendous opportunity to connect the Howell – Toledo route to the Detroit – Chicago route.

]]>