Author: Brian Coburn
Recent Posts
At a June 8 open house, the consultant performing a transportation corridor study for Plymouth Road to State Street gave a presentation on the some preliminary results from the needs analysis phase of the study – many of the trips in the corridor are UM campus related. The $640,000 Connector Feasibility Study is being funded by the UM, the city of Ann Arbor, the DDA, and the AATA. [Full Story]