Stories indexed with the term ‘First and Washington’

City Apartments Elevation Revisions OK’d

At its Oct. 17, 2011 meeting, the Ann Arbor city council approved modifications to Village Green’s already-approved City Apartments planned unit development (PUD) at First and Washington. [This should not be confused with the similarly named City Place matter-of-right proposal by a different developer on South Fifth Avenue].

The changes include increasing the height of the structure from 94 to 104 feet, adding an entrance on First Street, modifying the window type and size on the residential portion of the building, and adding ventilation screens on the east side (alley) of the building.

The City Apartments project was given PUD zoning and site plan approval by the council on Nov. 6, 2008. The nine-story building will include 156 dwelling units and 244 parking spaces on the first two floors. The site is currently a city-owned property functioning as a surface parking lot with 64 spaces, after the parking structure there had to be demolished due to its poor structural condition. The new parking deck, which will offer spaces to the general public as well as to residents, is being financed by the Ann Arbor Downtown Development Authority.

The sale of the property, for a little over $3 million, is part of the city of Ann Arbor’s financing plan for construction of the new municipal center, which houses the police department and the 15th District Court. The council has extended the purchase option on the First and Washington property several times, most recently on Aug. 4, 2011.

At one of the DDA board’s late August committee meetings, news of a pending deal and imminent construction was relayed to committee members. The council is expected to authorize the closing on the deal at its Nov. 10, 2011 meeting. Signs at the First and Washington parking lot warn patrons of the lot’s imminent closure.

This brief was filed from the city council’s chambers on the second floor of city hall, located at 301 E. Huron. A more detailed report will follow: [link] [Full Story]

Village Green Purchase Price Dips by $100K

At its June 6, 2011 meeting, the Ann Arbor city council authorized a revision to the purchase option agreement with Village Green on the city-owned First and Washington site, where the developer plans to build a 9-story, 99-foot-tall building with 156 dwelling units. That revision reduces the price from $3.3 million to $3.2 million.

The break on the price is related to the “bathtub” design for the foundation of a 244-space parking deck, which makes up the first two stories of the development. The site of the development is near Allen Creek, and some kind of design strategy is required in order to deal with the possibility of water entering the parking structure. Rather than use a hybrid design that would entail pumping water out of the structure and into the city’s stormwater system on an ongoing basis, Village Green wants to use a complete bathtub-type design that will cost around $250,000. The city’s price break is thus a portion of that cost.

The parking deck is being developed in cooperation with the Ann Arbor Downtown Development Authority, which has pledged to make payments on around $9 million worth of bonds, after the structure is completed and has been issued a permit for occupancy.

The timeline put in place on Aug. 5, 2010 – when the city council most recently approved an extension of Village Green’s option to purchase the First and Washington city-owned parcel – called for Village Green to purchase the land by June 1, 2011. However, that deadline was subject to an extension of 90 days by the city administrator – an option which the interim administrator then exercised. That sets a new deadline of Aug. 30, 2011 for purchase of the parcel. The proceeds from the sale of the land were a part of the city’s financing plan for the new municipal center at Fifth and Huron, which is currently in the final stages of construction.

This brief was filed from the city council’s chambers on the second floor of city hall, located at 301 E. Huron. A more detailed report will follow: [link] [Full Story]