The city’s cost for the $47,971 project would be $14,179. The difference will be reimbursed through a grant.
According to the staff memo accompanying the resolution, part of the rationale for the choice of locations is “a history of pedestrian crashes that made them candidates for safety grant funding.” Responding to an emailed request from The Chronicle, city engineer Patrick Cawley provided the following accident history for the locations:
This brief was filed from the city council’s chambers on the second floor of city hall, located at 301 E. Huron.
]]>The flashing function of an RRFB would not be continuous – it would be activated by a pedestrian pushing a button. The staff memo accompanying the resolution describes an RRFB as “similar in nature to the light bars on the top of emergency vehicles.” The flashing beacons do not count as traffic control signals for the purposes of the city’s pedestrian safety ordinance, which addresses motorist behavior “[w]hen traffic-control signals are not in place or are not in operation …” Otherwise put, the pedestrian safety ordinance will still apply at those crosswalks where RRFBs are installed.
Annual costs for operation and maintenance of the RRFBs are estimated at $160 per crossing. Installation of the new signs is scheduled to begin in February 2012, and to be completed by April 2012.
This brief was filed from the city council’s chambers on the second floor of city hall, located at 301 E. Huron. A more detailed report will follow: [link]
]]>