The Ann Arbor Chronicle » study http://annarborchronicle.com it's like being there Wed, 26 Nov 2014 18:59:03 +0000 en-US hourly 1 http://wordpress.org/?v=3.5.2 State Street To Be Studied as Transportation Corridor http://annarborchronicle.com/2014/06/03/state-street-to-be-studied-as-transportation-corridor/?utm_source=rss&utm_medium=rss&utm_campaign=state-street-to-be-studied-as-transportation-corridor http://annarborchronicle.com/2014/06/03/state-street-to-be-studied-as-transportation-corridor/#comments Tue, 03 Jun 2014 04:53:35 +0000 Chronicle Staff http://annarborchronicle.com/?p=138030 Parsons Brinckerhoff Michigan Inc. will conduct a study of the South State Street transportation corridor in Ann Arbor as a result of city council action to approve a $299,911 contract at its June 2, 2014 meeting.

The 1.3-mile long area of the study extends from the intersection of Ellsworth Road and South State Street north to the intersection of Oakbrook Drive and South State Street. The money to pay for the study will be drawn in equal parts from the current fiscal year and next year’s general capital fund budget. The study will take a year, starting in June 2014.

The goal of the study is focused on transportation needs in the corridor and to provide base conceptual engineering plans for the redesign of the corridor – possibly including a boulevard “Complete Street” design. The redesign would be intended to “address all modes of travel; enhance vehicle flow; improve safety; create an aesthetically pleasing entrance to the City; and, utilize sustainable concepts such as low impact design (‘LID’), and low energy use lighting.”

The study of the area as a transportation corridor comes not long after a recently completed South State Street corridor plan, adopted by the city council into the city’s master plan at its July 15, 2014 meeting. That corridor plan established planning objectives for the land use along the corridor.

Besides Parsons Brinckerhoff, the other bidder for the work was DLZ.

This brief was filed from the city council’s chambers on the second floor of city hall, located at 301 E. Huron.

]]>
http://annarborchronicle.com/2014/06/03/state-street-to-be-studied-as-transportation-corridor/feed/ 0
Ann Arbor Council Tables Water Main Study http://annarborchronicle.com/2011/05/16/ann-arbor-tables-study-of-water-mains/?utm_source=rss&utm_medium=rss&utm_campaign=ann-arbor-tables-study-of-water-mains http://annarborchronicle.com/2011/05/16/ann-arbor-tables-study-of-water-mains/#comments Tue, 17 May 2011 02:28:31 +0000 Chronicle Staff http://annarborchronicle.com/?p=63757 At its May 16, 2011 meeting, the Ann Arbor city council tabled a $208,984 contract with AECOM for a study of its water distribution system. The money for the study, which dates from a 2007 request for proposals (RFP), was allocated in the fiscal year 2011 budget of the city’s water fund. The level of service (LOS) study to be done by AECOM will recommend a sustainable level of service for the city’s water distribution system, and determine how much investment it would take to achieve that level. The study would also help the city decide, for example, which water mains should be replaced first.

The item was tabled for essentially two reasons. First, councilmembers expressed concern about the general issue of using consultants to communicate with residents, instead of relying on city staff. Second, councilmembers had concerns about the cost of the study, and they were inclined to delay action on all budget-related issues, given their plan to delay action on the FY 2012 budget, which was achieved through a recess of the meeting until Monday, May 23. When the meeting continues at that time, the water distribution system study can be taken off the table for deliberation and a vote.

This brief was filed from the city council’s chambers on the second floor of city hall, located at 301 E. Huron. A more detailed report will follow: [link]

]]>
http://annarborchronicle.com/2011/05/16/ann-arbor-tables-study-of-water-mains/feed/ 0