Next Steps Taken on S. State Corridor Plan
Moving ahead on a project that’s been long in the works, Ann Arbor planning commissioners have now recommended that the city council distribute a draft of the South State Street corridor plan to neighboring jurisdictions and other stakeholders, such as the University of Michigan, the Ann Arbor Public Schools, and the Ann Arbor Area Transportation Authority. It’s the next step toward adopting the corridor plan’s recommendations into the city’s master plan. The vote took place at the commission’s Jan. 3 meeting [.pdf of draft South State corridor plan]
The plan includes more than 40 overall recommendations for the corridor, which stretches about 2 miles between Stimson Street at the north end down to Ellsworth in the south. Recommendations are organized into categories of the city’s sustainability framework: Land use and access, community, climate and energy, and resource management.
Among the recommendations are: (1) Evaluate use of vacant parcels for alternative energy generation; (2) Evaluate integration of public art along the corridor; (3) Evaluate use of open land for community gardens; (4) Assess and improve high crash areas along the corridor; (5) create boulevard on State Street between Eisenhower and I‐94 to enable safer automobile, bicycle, and pedestrian movement; (6) Consider utilizing vacant parcels for athletic fields and recreation facilities; (7) Develop a pedestrian and bicycle path along the Ann Arbor railroad that will connect the planned Allen Creek bikeway to Pittsfield Township through the corridor; and (8) Resurface roads in the corridor.
Each recommendation includes several related action items. The report also provides a section that organizes the recommendations into each of three distinct sections of the corridor: (1) from Stimson on the north to Eisenhower Parkway; (2) from Eisenhower south to the I-94 interchange; and (3) from I-94 to Ellsworth. In addition, there are nine site-specific recommendations for areas including Briarwood Mall, the complex of hotels near Victors Way and Broadway, and the research park development near the corridor’s south end.
The city planning commission and staff have been discussing this project for several years, but have accelerated work on it within the past 12-18 months. See Chronicle coverage: “South State Corridor Gets Closer Look,” “Sustainability Goals Shape Corridor Study,” and “Ideas Floated for South State Corridor.”
This brief was filed from the second-floor council chambers at city hall, 301 E. Huron, where planning commission holds its meetings. A more detailed report will follow: [link]