Christian Reformed Church Project OK’d
A project to expand the Ann Arbor Christian Reformed Church at 1717 Broadway St. received a go-ahead from the city planning commission at its Oct. 1, 2013 meeting.
The site plan proposal calls for tearing down five existing buildings and constructing a 12,850-square-foot, two-story addition to the rear of the church. The addition would be used for educational activities at the church, which is located on a 4.3-acre site in Ward 1, southwest of Broadway’s intersection with Plymouth Road.
According to a staff memo, only minor changes are proposed for the existing 142-space parking lot. Additional sidewalks will be added, including a roughly 20-foot extension of the public sidewalk along Broadway Street, which currently stops short of the south property line.
Because the church is located in an area zoned for single-family residential use (R1C zoning), a special exception use approval is needed from the planning commission. The city’s planning staff noted that the church has been located there for about 50 years. The church has a capacity of 126 seats, which will remain unchanged. Planning commissioners unanimously voted to grant approval for a special exception use.
The project is estimated to cost about $3 million. No approval is required from the city council for the special exception use, but the council will need to consider the site plan for approval.
This brief was filed from the second-floor city council chambers at city hall, 301 E. Huron St. A more detailed report will follow.