Counted 14 double-trailer gravel trucks pointed southwards, waiting their turn to back their way along the railroad track and add their loads to the embankment repair. [photo] They’re backing right down the section of track that Ann Arbor Railroad did some straightening work on back in fall 2008.
Traver & Bowen
» Want more items like this one? Visit the Stopped. Watched. page.