Streets for 2012: 25 Lane Miles Resurfaced
The city of Ann Arbor’s street millage expenditure report for the 2012 construction season indicates that approximately 25 lane miles on 36 different streets were resurfaced or reconstructed this past season. Total construction cost was about $8.2 million, allocated between major streets (one-third) and local streets (two-thirds).
The street repair millage, renewed by voters in 2011, is levied at a rate of 2 mills, which generates about $9 million annually. The street millage expenditure report was attached to the city council’s Feb. 4, 2013 meeting agenda as a communication.
According to city project manager Nick Hutchinson, responding to an emailed query, the miles of streets resurfaced as reported in the city’s comprehensive annual financial report (CAFR) is a different measure – in two ways – from the lane miles reported in the 2012 millage report. First, the CAFR statistic (which has typically ranged between 4 and 7 miles over the last six years) reflects simply the length of the roadway. Second, the CAFR statistic is based on fiscal years (starting on July 1), whereas the millage report is a based on the activity in a calendar year.
Also approved by voters in 2011 was a new 1/8 mill sidewalk repair millage, which generated roughly $500,000 in revenues. According to the city’s report, about $561,000 worth of work was done under the sidewalk repair program, which included replacement of 1,475 slabs of sidewalk and the trimming of an additional 6,380 slabs.
Work also completed that was funded by the street millage program – not the sidewalk millage – were sidewalk ramps on 395 street corners, which are on a list to be replaced under a consent decree. The consent decree requires curb ramps to be installed on all street corners where the city resurfaced or reconstructed streets between 1992 and 2004. The Americans with Disabilities Act was enacted in 1990. [.pdf of street millage report] [.pdf of map showing streets resurfaced in 2012]
This brief was filed from the city council’s chambers on the second floor of city hall, located at 301 E. Huron. A more detailed report will follow: [link]