2015 Work Plan OK’d by AAATA Board
The 2015 work plan has been approved by the board of the Ann Arbor Area Transportation Authority at its Aug. 21, 2014 meeting. [2015 AAATA Work Plan]
Highlights of new items include measurements of service performance – an initiative that comes in the context of additional transportation services to be offered starting Aug. 24. Those services will be funded with proceeds from a new millage that voters approved on May 6, 2014.
Another highlight is the construction of a walkway across the block between Fourth Avenue and Fifth Avenue on the north side of the parcel where the new Blake Transit Center has been constructed. The re-orientation of the new transit center to the south side of the parcel makes it possible to contemplate the walkway along the north side, which abuts the Federal Building. According to CEO Michael Ford’s regular written report to the board for August, he has made a funding request from the Ann Arbor Downtown Development Authority to fund the construction of the pedestrian walkway.
This brief was filed from the AAATA headquarters building at 2700 S. Industrial Highway, where the board held its Aug. 21 meeting – due to the closure of its regular meeting location at the downtown location of the Ann Arbor District Library. The library building was closed to due to the repair of the public elevator.