Hunt Park on “fire.” [photo]
Archive for October, 2012
Third Group Forms to Oppose Library Bond
A third group – called “LOL=Love Our Library” – has formed to oppose the Ann Arbor District Library’s $65 million bond proposal to build a new downtown building. The group filed campaign finance paperwork with the Washtenaw County clerk’s office earlier this week, on Oct. 2, to form an official ballot question committee. Sheila Rice is listed as treasurer.
Douglas Jewett had filed paperwork on Sept. 25 for the Save the Ann Arbor Library ballot question committee. He also secured a sidewalk vendor permit on Aug. 20 for space in front of the downtown library at 343 S. Fifth. He uses the space to lobby against demolition of the current building, citing its architectural significance. The original portion of the building … [Full Story]
Sylvan Twp: Recount
The Chelsea Standard reports that a recount will take place for the Aug. 7, 2012 Sylvan Township ballot question regarding a millage proposal for debt repayment on water and sewer bonds. A recount had been requested following the narrow passage of the millage – 480 yes votes (50.37%) compared to 473 (49.63%) no votes. But during the recount on Sept. 4, the county board of canvassers determined that the ballot seal had not been appropriate and the recount didn’t proceed. On Oct. 3, judge Archie Brown of the 22nd circuit court ruled that a recount could move forward within 21 days. [Source]
County Increases Tax for Economic Development
After holding a public hearing on a tax increase to support agriculture and economic development, the Washtenaw County board of commissioners authorized the Act 88 tax at a rate of 0.06 mills, an increase from the current 0.05 mills.
The action occurred at the board’s Oct. 3, 2012 meeting. The vote on an amendment to increase the tax rate passed 6 to 5, with dissent from Ronnie Peterson, Alicia Ping, Wes Prater, Dan Smith and Rob Turner. The vote to levy the tax passed 8-3, with Ronnie Peterson, Wes Prater and Dan Smith voting against it.
The board was on track to approve the tax last month at the 0.05 mill rate. But after a public hearing, board chair Conan Smith proposed an … [Full Story]
County OKs Animal Control Recommendations
Washtenaw County commissioners have passed a resolution outlining a general set of recommendations for animal control services, put forward by a policy task force that’s been meeting since May. The unanimous vote occurred at the board’s Oct. 3, 2012 meeting. It was an item brought forward during the meeting, and had not been part of the published agenda. The commissioners also received a more detailed report from the task force, which they plan to discuss at a later date. [.pdf of policy task force report]
The approval of recommendations works in concert with a directive already passed by the board at its Sept. 19 meeting. At that meeting, commissioners approved a resolution brought forward by Barbara Bergman that directed county … [Full Story]
Accommodation Ordinance Change in Works
Control over administering and enforcing Washtenaw County’s accommodation tax is being shifted from the county treasurer to the county finance director, following an ordinance change given initial approval by the county board of commissioners on Oct. 3, 2012. A final vote is expect on Oct. 17. The board also set a public hearing for that meeting, to seek input on the proposed changes.
The ordinance amendment passed by commissioners also shifts a 0.7 full-time equivalent accounting job from the treasurer’s office to the county finance department, and amends the accommodation tax policy to clarify that the tax is only assessed against the actual price of a hotel, motel or other rental – not against other amenities that the business might charge … [Full Story]
Washtenaw County Gives Environmental Awards
Four environmental excellence awards were given out by the Washtenaw County commissioners at their Oct. 3, 2012 board meeting. The awards ”honor local businesses and non-profit organizations who provide exceptional leadership in environmental protection during National Pollution Prevention Week.” The winners were chosen by the county’s environmental health division and the office of the water resources commissioner.
The University of Michigan’s Radrick Farms Golf Course received the 2012 Excellence in Water Quality Protection Award for its “innovative water and energy conservation measures, environmental stewardship programs, and stormwater management systems.” The 2012 Excellence in Waste Reduction and Recycling Award was given to Wylie Elementary School of Dexter, for its “extensive recycling program, purchasing of recycled products, and educating their students in waste reduction and conservation … [Full Story]
Main & Catherine
Looks like an evening fundraiser at the Broken Egg for Jim Fink, who’s running for 22nd circuit court judge against Carol Kuhnke. Campaign signs are on outside tables, folks milling about inside. [photo]
Resolutions Don’t Change Ordinances
In a report on a recent meeting of the Ann Arbor city council, we inaccurately described the council’s consideration of an amendment to an ordinance as considering “a resolution that would change” the ordinance. Ordinances are not changed through resolutions, but rather by voting directly on the amendments. In fact, a possible argument against adopting some resolution might be that it has the practical effect of amending an ordinance – which cannot be done through a simple council resolution. According to the city charter, ordinance amendments require two council votes of approval, taken at two separate meetings – which makes an ordinance change a different exercise from passing a resolution. We note the mistake here, and have corrected the … [Full Story]
WCC: Federal Grant
A report from Washtenaw Community College staff describes the Oct. 1 visit to WCC by Jay Williams, executive director of the U.S. Dept. of Labor Office of Recovery for Auto Communities and Workers. His visit highlighted a recent $2.9 million federal grant to WCC, enabling it to develop new courses for the IT industry. The report quotes WCC president Rose Bellanca: “During our strategic planning process we asked employers to tell us what kind of training they needed so that we could design it. Up to this point, we have only been able to plan for it. This grant allows us to make it happen.” [Source]
Ann Arbor DDA OKs $30K for Bike Parking Cage
A 50-bike storage facility that would have the footprint of two automobile parking spaces has been given approval by the Ann Arbor Downtown Development Authority board. [.jpg of footprint] The “cage” will be located in the downtown Ann Arbor Maynard Street parking structure.
The authorization of $30,000 from the DDA’s parking fund – for design, fabrication and installation of the bicycle storage facility – was given at the board’s Oct. 3, 2012 meeting. Similar “cages” in other cities use a chain-link fencing material. However, the DDA hopes that a more aesthetically pleasing option can be identified.
The facility is designed for commuters who would pay a rental amount for use of the “cage.” Bicyclists would still be responsible for securing their … [Full Story]
DDA Kicks in $30K for Transit Connector
The study of a transportation connector between the northeast and south sides of Ann Arbor has been given a $30,000 boost by the Ann Arbor Downtown Development Authority. The corridor runs from US-23 and Plymouth southward along Plymouth to State Street and farther south to I-94. This alternatives analysis phase of the study is to result in identifying a preferred choice of technology (e.g., bus rapid transit, light rail, etc.) and the location of stations and stops. The decision to help fund the project was made at the DDA board’s Oct. 3, 2012 meeting.
The grant from the DDA to the project would come from parking revenues, split equally between the current fiscal year (2013) and next year. It also would be contingent on the … [Full Story]
Parking Payment-in-Lieu OK’d for 624 Church St.
A proposed residential development at 624 Church St. in downtown Ann Arbor – a 13- or 14-story, 83-unit apartment building with approximately 181 beds – will be able to provide 42 spaces of required parking by contracting for the spaces in the public parking system. That’s instead of building the spaces on site as part of the project.
The authorization to work out the arrangement came on a vote taken at the Oct. 3, 2012 meeting of the Ann Arbor Downtown Development Authority board. The DDA manages the city’s public parking system under a contract with the city.
Ann Arbor’s “contribution in lieu of parking” program was authorized by the city council on April 2, 2012. That program allows essentially two options: (1) … [Full Story]
DDA to Put Roof on Public Housing Complex
The roof of Baker Commons, which offers 64 of the roughly 360 public housing units managed by the Ann Arbor Housing Commission, will be replaced using funds provided by the Ann Arbor Downtown Development Authority. The authorization of $260,000 was given at the DDA’s Oct. 3, 2012 board meeting.
Jennifer L. Hall, the commission’s executive director, had addressed the board at its Sept. 5, 2012 meeting and also spoke to board members on Oct. 3.
Baker Commons, on the corner of Packard and Main streets, is the only AAHC property within the Ann Arbor DDA district. The roof has had ongoing leaking problems, according to Hall’s presentation at the Sept. 5 meeting, and the housing commission has undertaken periodic patches. However, in the last … [Full Story]
Council Sails Through Flooded Agenda
Ann Arbor city council meeting (Oct. 1, 2012): The council worked through its densely packed agenda in well under two hours, even though six separate public hearings were held.
Some of the votes, all of which were unanimous, reflected non-action.
The council voted to table a revision to its medical marijuana licensing ordinance, having postponed it twice previously. Tabling is unlike a postponement to a date certain, and leaves open the possibility that the council might not ever take the question up again. However, Sabra Briere (Ward 1) indicated she intended to take up the medical marijuana ordinance again within six months.
The council has yet to act on recommendations from the city’s medical marijuana licensing board, made at the start of the year, to award licenses to 10 dispensaries. In the meantime, those dispensaries continue to operate. At the council’s Oct. 1 meeting, city attorney Stephen Postema indicated he would be creating a public document for the licensing board that would include a summary of pending legislation and court cases.
The council tabled a resolution on establishing a citizens committee to study the question of how to use proceeds from city-owned land sales. That tabling came at the request of the resolution’s sponsor, Mike Anglin (Ward 5), who had originally brought it forward at the council’s previous meeting.
The council also voted to extend by another 180 days a moratorium on digital billboards in the city – which the council first enacted back in April.
Three of the items on which the council took final action were at least indirectly related to stormwater. The council confirmed the appointment of the top area administrator whose department is responsible for stormwater management – Craig Hupy. Hupy’s appointment as public services area administrator comes after 26 years of service with the city.
The council also approved a $300,000 stormwater improvements component of a much larger $6.5 million street reconstruction project for Miller Avenue. The council authorized $50,000 to study the feasibility of opening up the railroad berm near Depot Street, which might allow floodwater to flow unimpeded to the Huron River on the other side. The study is also meant to cover the possibility of a non-motorized transportation connection under the berm, for pedestrians and bicyclists.
Related to water only in name was a tax abatement granted by the council to Barracuda Networks, which is relocating from Depot Street to downtown Ann Arbor and expecting to add 144 jobs.
The council also approved a raft of proposals related to land use. Winning approval were site plans for a Fiat dealership on West Stadium Boulevard and an expansion of the Food Gatherers facility on Carrot Way. The rezoning of a strip around the perimeter of a parcel at Miller and Maple, where a Speedway gas station will be constructed, got final approval.
A proposed townhouse project on Catherine Street got its rezoning as well as site plan approved. At the public hearing neighbors praised the project and developer Tom Fitzsimmons for what he had done to work with them.
The Plymouth Green Crossings project, which has already been built, got initial approval for revisions to its planned unit development (PUD) supplemental regulations.
The council also added 73 acres to the land protected under the city’s greenbelt program by approving the purchase of development rights on the Hornback farm in Salem Township.
The council weighed in on a state ballot question – which would require electric utility companies in Michigan to provide 25% of their power with renewable sources by the year 2025 – by passing a resolution in support of it.
One of the more significant pieces of news to come out of the meeting was an announcement from Stephen Kunselman (Ward 3) that he could not attend the council’s Oct. 15 meeting. That’s when the council is due again to take up the question of putting $60,000 towards a $300,000 local match for a $1.2 million federal grant that would fund a transportation connector study. It needs eight votes to pass. [Full Story]
Fifth & Catherine
About half of the parking meters in the city lot are bagged, making farmers market parking complicated.
Fifth & Huron
A display of Ann Arbor water bottles for sale at city hall’s main counter. Didn’t realize there were so many options – six types, highest one costs $20. [photo]
PAC: Downtown Park, More Input Needed
Ann Arbor park advisory commission meeting (Sept. 18, 2012): Reprising issues they discussed in August, commissioners heard from several residents about the need for: (1) more downtown green/open space; and (2) one or more centrally located dog parks.
PAC took action on one of those topics, passing a resolution to give formal input on the Connecting William Street project. That effort, led by the Ann Arbor Downtown Development Authority, is process to examine five city-owned parcels for possible redevelopment. All but one of the sites are now used as surface parking lots.
PAC did not advocate that a particular site be turned into a park. Rather, the resolution recommends that the Ann Arbor city council seek additional evaluation of locations for a downtown park, the best mix of amenities for the population expected to use a downtown park, and the costs of developing and maintaining a new addition to the parks system. PAC also recommends that the council refrain from adopting plans for the five city-owned lots before resolving the question about open space in the Connecting William Street area. [.pdf of final Connecting William Street resolution]
At the start of the meeting, three members of the Library Green Conservancy – advocates of creating a commons on top of the Library Lane underground parking structure – spoke during public commentary. [The Library Lane site is one of the five properties included in the Connecting William Street project.] They urged commissioners to support their plan for a park at that location, adjacent to the library. The underground structure was built with a foundation to support a high-rise building on the site, in addition to a plaza area. PAC’s recommendation to the city council did not highlight that particular site.
Also during the meeting, commissioners heard from two speakers during public commentary who supported the creation of more dog parks. One speaker noted that despite potential problems – such as dog fights and the fact that ”pooping can occasionally go unnoticed” – a dog park poses no greater liability than a skatepark, pool or “even simply sidewalks.”
Colin Smith, the parks and recreation manager, told commissioners that staff did not support an unfenced option, but indicated that they’re exploring possible locations for one or more fenced-in dog parks. One possible site: A parcel on the east side of West Park, near the entrance off of Chapin.
PAC also was briefed on plans for rain gardens and other biodetention measures at Miller Nature Area and Garden Homes Park, in connection with a major reconstruction of Miller Avenue next year.
Smith also updated commissioners on letters of objection that had been submitted to the Michigan Dept. of Environmental Quality (MDEQ) regarding plans to build a section of whitewater in the Huron River, near the Argo Cascades. A permit is needed from the MDEQ before the project can move forward. For a full report on this issue, see Chronicle coverage: “EPA, Others Object to Whitewater Project.”
It was the last meeting for commissioner Doug Chapman, whose term ended on Sept. 30. At the city council’s Oct. 1 meeting, his replacement was confirmed: Melissa Stults, a doctoral student at the University of Michigan’s Taubman College of Architecture and Urban Planning. [Full Story]
AATA to County: Make New Transit Authority
At a special meeting held on Oct. 2, 2012, the board of the Ann Arbor Transportation Authority unanimously passed a resolution requesting that the Washtenaw County clerk file articles of incorporation for a new countywide transit authority to be called The Washtenaw Ride. The articles will be filed under Act 196 of 1986.
The creation of the new authority will be made official when the Washtenaw County clerk files the paperwork with the state, likely on Oct. 3. [Added shortly after initial publication: Although the Oct. 3 date was the expectation expressed at the AATA board's Sept. 27 meeting, the wording of a Washtenaw County board of commissioners resolution on the topic indicates that a step of alerting jurisdictions of the ... [Full Story]
A2: Outdoor Education
The Center for Michigan’s Bridge magazine publishes an opinion piece by Andy Buchsbaum, director of the Great Lakes Office of the National Wildlife Federation in Ann Arbor. Buchsbaum describes an “indoor childhood epidemic” and advocates for education that gets students outside. “If the well-being of kids and our conservation future demand kids get outside, let’s open the door. If we want to cultivate engaged students, let’s do that, too. Yes, it will be a challenge, but it is infinitely possible – and without breaking the bank. It’s possible, that is, if we are willing to chart a new course.” [Source]
UM: Presidential Race
A National Public Radio report looks at how presidential candidates Mitt Romney and Barack Obama are addressing the issue of housing. The report quotes University of Michigan professor Michael Barr, a former Treasury official, who describes Obama’s approach in his first term and plans for a second term. Barr concludes: “There is no silver bullet. There are lots of things that need to get done. Each homeowner’s circumstance is somewhat different. And trying to figure out how to get them help is, I think, a more complicated and difficult task than would be reflected in a bullet point or a sound bite.” [Source]
Barracuda Gets Tax Break from Ann Arbor
Following a public hearing on the topic, the Ann Arbor city council has granted a tax abatement to Barracuda Networks in connection with its relocation from Depot Street to the old corporate headquarters of Borders in downtown Ann Arbor, off Maynard Street. The total tax break for the 5-year period of the abatement is expected to be worth $61,000. That’s less than the originally estimated amount of $85,000. The council’s action came at its Oct. 1, 2012 meeting.
Barracuda is a computer network security company. On its application for the abatement, Barracuda indicates that it currently has 155 employees who will be retained due to the abatement. The firm expects to add 144 employees by July 1, 2014. The property on which Barracuda is requesting … [Full Story]
Additional Committee for Downtown Tabled
A proposed 10-person citizen committee to study options for proceeds of the sale of city-owned downtown Ann Arbor properties was tabled by the city council at its Oct. 1, 2012 meeting. The resolution’s sponsor, Mike Anglin (Ward 5), moved for the resolution’s tabling in light of many other concurrent conversations among several groups in the city.
The resolution had been added by Anglin to the agenda of the council’s previous meeting on Sept. 17, 2012, but was postponed until the Oct. 1 meeting. Anglin’s resolution called for establishing a committee of 10 residents – two from each ward, to be selected by councilmembers from each ward – plus other city officials to address the issue of city-owned parcels in downtown Ann Arbor.
Anglin’s resolution … [Full Story]
Craig Hupy to Lead Ann Arbor Public Services
Craig Hupy has been appointed as public services area administrator for the city of Ann Arbor. The city council confirmed Hupy as the choice of city administrator Steve Powers at its Oct. 1, 2012 meeting. Hupy has been serving as interim area administrator for the better part of a year. Public services includes drinking water, stormwater, sanitary sewer, streets, fleet, systems planning and field operations.
Hupy is an engineer by training, and holds a bachelor of science degree from Michigan Technological University. He’s worked for the city since 1986.
The city council’s appointment of the position is stipulated in the city charter in Section 12.1(b): “The appointive officers shall be the City Administrator and the Attorney, who shall be appointed by the Council; … [Full Story]
Council Moves on Miller Stormwater Project
A $300,000 stormwater improvements proposal for Miller Avenue – between Maple Road on the west and Newport Road on the east – was moved forward by the Ann Arbor city council at its Oct. 1, 2012 meeting. The stormwater improvements are part of a larger road reconstruction project, which will cost about $6.505 million.
The stormwater improvements will consist of rain gardens and infiltration basins within the right-of-way. The pavement will not be porous, however, so it will be a traditional road surface.
The goal of the improvements is to reduce the amount of stormwater entering the stormwater pipes that flow directly to the Huron River. The idea is that if water is processed through rain gardens and infiltration basins, it will contain fewer contaminants that … [Full Story]
Hornback Farm Added to Ann Arbor Greenbelt
The Hornback farm in Salem Township has been added to the land protected by Ann Arbor’s greenbelt program. The city council approved $199,367 from the city’s open space and parkland preservation millage for the purchase of development rights on the property at its Oct. 1, 2012 meeting. The roughly 73-acre farm is located on Pontiac Trail and Brookville Road.
The appraised value of the property was $321,000, but the landowner made a 10% donation of $32,100, leaving a purchase price of $288,900. Of that, the city of Ann Arbor’s share was $160,500 after contributions from Salem Township and Washtenaw County of $64,200 apiece. The city incurred due diligence costs ($10,000), closing costs ($5,000) and made a contribution to the greenbelt endowment … [Full Story]
Council Supports 25-by-25 Ballot Question
The Ann Arbor city council has passed a resolution in support of a statewide Michigan ballot proposal that would require electric utilities to provide at least 25% of their annual retail sales of electricity from renewable energy sources by the year 2025. The action was taken at council’s Oct. 1, 2012 meeting.
Renewable energy sources are defined as wind, solar, biomass, and hydropower. Although it would change the state’s constitution, the proposal includes provisions that could extend the 2025 deadline into the indefinite future. An annual extension could be granted if it would prevent rate increases of more than 1% per year. The proposal would limit rate increases required to achieve the 25% standard to no more than 1% per year.
This brief was filed … [Full Story]
Food Gatherers Site Plan Comes Up Carrots
Food Gatherers has received approval to expand its large warehouse, adding cooler and freezer space to accommodate its focus on fruits, vegetables and other fresh food. The Carrot Way site, on Ann Arbor’s far north side, is a hub for the nonprofit’s food distribution. The approval came at the Ann Arbor city council’s Oct. 1, 2012 meeting. The city planning commission recommended approval of the site plan at its Aug. 21, 2012 meeting.
The site plan was a revision to the nonprofit’s planned unit development (PUD), which will allow for a 12,646-square-foot addition to the back of the existing 16,977-square-foot building.
That building houses the nonprofit’s administrative offices, storage warehouse, and training space. The plan also will add 22 parking spaces to the site, … [Full Story]
Fiat Site Plan Gets Council OK
A plan to build a new Fiat showroom next to the post office on West Stadium Boulevard received approval from the Ann Arbor city council at its Oct. 1, 2012 meeting. The property is owned by the Suburban Collection of Troy. The site plan was recommended to the council for approval by the planning commission at its Aug. 21, 2012 meeting.
The property had originally been developed in the late 1950s as a gas station, but underground tanks have been removed. It had been purchased by the Naylor Chrysler dealership in the mid-1990s, and most recently was acquired by the Suburban Collection of Troy, which operates a Chrysler Jeep dealership across the street at 2060 W. Stadium. Suburban also owns local Cadillac … [Full Story]
Council Extends Digital Billboard Moratorium
A moratorium on the erection of digital billboards in Ann Arbor has been extended by another 180 days. The city council took the action to extend the moratorium at its Oct. 1, 2012 meeting. The moratorium, which also prevents city staff from even considering applications to put up digital billboards, was first enacted at the council’s April 17, 2012 meeting.
Falling under the moratorium are “billboards commonly referred to as ‘electronic message centers,’ ‘electronic message boards,’ ‘changeable electronic variable message signs,’ or any billboard containing LEDs, LCDs, plasma displays, or any similar technology to project an illuminated image that can be caused to move or change, or to appear to move or change, by a method other than physically removing and replacing the sign … [Full Story]