Stories indexed with the term ‘infrastructure’

Downtown Library To Close for Elevator Repair

The Ann Arbor District Library’s downtown building at 343 S. Fifth Ave. will be closed indefinitely starting Thursday, Aug. 14 for repair of the public elevator.

AADL director Josie Parker gave an update on her director’s blog: ”It will remain closed into next week for certain. The repair requires casings that are concreted into the elevator shaft to be removed. A drilling rig will be brought in on Thursday, and the work area will be exposed in such a way that makes it impossible for the Downtown library to be open to the public.”

The elevator has been out of commission since this spring, after leaks had developed in the hydraulic piston, causing it to fail a weight test. At their July … [Full Story]

Ann Arbor OKs $480,000 for Traffic Signals

A contract with Carrier & Gable Inc. for the purchase of $480,000 worth of traffic signals has been approved by the Ann Arbor city council. Action came at the council’s Aug. 7, 2014 meeting.

The list of signals covered in the contract includes:

  • Varsity and Ellsworth pedestrian signal upgrade ($25,000)
  • King George and Eisenhower pedestrian signal upgrades ($35,000)
  • Maintenance operations, including wear-out and accident damage, and support of other city projects ($300,000)
  • Addition of flashing yellow arrows for left turn movement at the following locations ($55,000): Fuller & Glenn; Barton & Plymouth; Plymouth & Broadway; Eisenhower & Stone School; Cedar Bend & Fuller; Fuller & Glazier Way; Fuller & Fuller Ct.; Fuller & Huron High
  • Division and Catherine ($65,000)

The council approved the contract with Carrier & … [Full Story]

AADL Makes Infrastructure Investments

Ann Arbor District Library board meeting (July 21, 2014): Action at the July board meeting allocated in total nearly $570,000 toward three infrastructure projects, mostly related to the downtown library. A special meeting on July 29 added $75,000 to that amount.

Rachel Coffman, Ann Arbor District Library, The Ann Arbor Chronicle

Rachel Coffman spoke during public commentary to earn points in the AADL summer game. (Photos by the writer.)

Most of the funding was for renovations of the downtown library’s front entrance. The board authorized a $425,523 construction budget for that project at 343 S. Fifth Ave., which has been in the works for several months. The budget covers new doors, a redesigned facade, and heated sidewalks, among other changes. The construction manager is O’Neal Construction of Ann Arbor.

Also related to the downtown library, trustees authorized a $93,598 contract with Schindler Elevator Corp. to repair the public elevator, which has been out of commission since this spring.

A week after the July 21 meeting, the board called a special meeting for July 29 to address additional issues related to the elevator. The four board members present at that meeting voted to authorize an additional $75,000 for elevator work.

Because of the elevator repair work, the Friends of the AADL bookshop is now located in the main first-floor lobby of the downtown building, rather than its normal location in the lower level, which is closed. It’s been in the lobby since June 30, and is open all of the hours that the building is open. Books are sold at the circulation desk.

The third infrastructure project approved on July 21 was $50,000 for carpet replacement in parts of the downtown library, as well as at the branch located at the Westgate Shopping Center.

The money for all three projects will be taken from the fund balance, which stood at $8.17 million as of June 30.

In other action on July 21, the board approved five adjustments to the 2013-14 budget, for the prior fiscal year ending June 30, 2014. The adjustments totaled $96,300.

Public commentary was dominated by fans of AADL’s summer game – in part because they could earn points by speaking to the board. Other issues raised during public commentary included concerns about communication, outreach to underserved populations, the cost of renovations to the downtown library entrance, and the “purging” of reference books.

The board’s August meeting is canceled. The next scheduled board session is on Sept. 15. [Full Story]

Council Acts on Infrastructure Items

The Ann Arbor city council’s July 21, 2014 meeting featured action on a raft of infrastructure items – from street and sidewalk construction and bridge inspections to the purchase of pumps for the wastewater treatment facility.

The council approved a $1,537,608 construction contract with Bailey Excavating Inc. for the Springwater subdivision improvements project. That work will cover the reconstruction of streets and some utilities – on Butternut Street from Cardinal Avenue to Springbrook Avenue, and Nordman Avenue from Packard Road to Redwood Avenue.

Funding for the project will be drawn from the street millage fund ($883,316), stormwater fund ($903,065), and drinking water funds ($489,574) for a total project cost of $2,275,955.

Funding from the drinking water and stormwater funds is based on the … [Full Story]

Infrastructure Items Get Council OK

Several infrastructure items received approval at the Ann Arbor city council’s July 7, 2014 meeting – related to sidewalk special assessment rolls, pool liners, and street repair.

Receiving final approval were special assessments of property owners to help pay for construction of three different sidewalks – on Stone School Road, Barton Drive and Scio Church Road.

The new sidewalk on Stone School Road will be on the west side of the road. This work will be done in conjunction with the Stone School Road reconstruction project from I-94 to Ellsworth Road. The total sidewalk project cost is roughly $128,500, of which about $55,000 will be special assessed. A public hearing on the special assessment took place at the council’s July 7 meeting. Three … [Full Story]

DDA Acts on Infrastructure, Governance

Ann Arbor Downtown Development Authority board meeting (July 2, 2014): Much of this month’s meeting was devoted to infrastructure projects and organizational matters, as the DDA board restructured its committees and elected new officers for fiscal 2015, which began on July 1.

Bob Guenzel, Sandi Smith, John Mouat, Ann Arbor DDA, The Ann Arbor Chronicle

From left: DDA board members Bob Guenzel, Sandi Smith, John Mouat. Smith officiated her last meeting as chair on July 2, and Mouat was elected to serve as chair for fiscal 2015, which began on July 1. (Photos by the writer.)

The board approved a $390,000 grant related to an extended-stay hotel project on the downtown’s west side. The development is by First Martin Corp. at 116-120 W. Huron – the intersection of Huron and Ashley streets. The grant will be used to pay for a new 12-inch water main, sidewalk improvements along Ashley, and landscape maintenance in the public right-of-way.

This was the first grant awarded after the board adopted a grant policy earlier this year.

The board also gave a one-year extension to a previously-awarded $650,000 brownfield grant for the 618 S. Main apartment complex. It was originally awarded in 2012, but the project is not yet completed – in part because of the recent harsh winter. The funds would help pay for upsizing a water main to 12 inches, as well as streetscape improvements and a rain garden for stormwater management.

Also related to infrastructure, the board established a project budget of $100,000 for tree maintenance and sidewalk repairs in downtown Ann Arbor in fiscal 2015.

Related to personnel issues, the board held a closed session to evaluate Susan Pollay, the DDA’s executive director. After about 15 minutes, the board emerged and voted to give Pollay a 5% raise, increasing her salary from $109,119 to $114,570.

In describing the rationale for the raise, Roger Hewitt noted that Pollay had received “good raises” in the last two years, but for the six years before that she had not received a raise because of the difficult economy. Her position as a city employee is in the Level 2 category, which has a salary range from $95,000 to $157,000. Several board members indicated a desire to move Pollay toward the midpoint of that range over the next few years. Sandi Smith characterized it as “catch up” to compensate for the years when Pollay didn’t get a raise. Hewitt said the intent is to bring her up to that midpoint salary of $126,000 “within a fairly short time period.”

Casting the sole vote against the 5% increase was city administrator Steve Powers, who said he’d be more comfortable with a 3% raise, and hoped there would be a more robust evaluation process in the future.

Immediately after its regular monthly meeting, the board held its annual meeting to elect officers for the coming fiscal year. John Mouat was unanimously elected to serve as chair of the board. Other officers are Roger Hewitt (vice chair), Rishi Narayan (treasurer), and Keith Orr (secretary). Outgoing chair Sandi Smith was thanked for her service, and received a gift from staff – a small pin from the former Selo/Shevel Gallery, which Pollay indicated evoked a cityscape of tall buildings. Pollay said it was inspired by a trip that several DDA staff and board members took last year to New York City for the International Downtown Association conference.

Also at the July 2 meeting, the board dissolved its two existing committees and created four new committees: (1) marketing, (2) partnerships/economic development, (3) finance, and (4) operations (parking/transportation/construction).

In supporting the idea of a separate marketing committee, Narayan noted that if a staff member is hired to focus on marketing and communications, “this area might become more fleshed out very quickly.” Previously, a marketing subcommittee had been part of the partnerships committee. The new finance committee was created in part in anticipation of the DDA’s growing budget, and a desire for more financial oversight.

During updates, Hewitt reported that work continues on a possible north/south commuter rail between Ann Arbor and Howell known as WALLY – the Washtenaw and Livingston Line. A recommendation will be coming soon to locate a stop on the east side of the railroad tracks between Liberty and Washington streets, opposite of the former city maintenance yard. He stressed that this transportation service is probably a significant way off from being offered. If the project moves forward, the recommended stop wouldn’t be a full station – it would simply be a platform with canopies, and would be built entirely within the railroad right-of-way. Hewitt plans to make a short formal presentation about the recommendation at a future DDA board meeting.

Also related to transportation, Orr reported that the new Greyhound ticket office at the Fourth & William structure will be opening next week – ahead of schedule. Next week also will be the grand opening of the nearby Blake Transit Center, operated by the Ann Arbor Area Transportation Authority.

In other updates, Hewitt noted that members of the DDA’s operations committee continue to work on a downtown ambassadors program, and are likely to bring two potential service providers in for interviews by the end of this summer. [Full Story]

DDA OKs $100K for Sidewalks, Trees

Tree maintenance and sidewalk repairs in downtown Ann Arbor will get $100,000 of support from the Ann Arbor Downtown Development Authority as a result of board action taken at its July 2, 2014 meeting.

The work will include repairs like displaced bricks and uneven sidewalk flags, as well as pruning of trees.

The money to pay for the work will be drawn from tax increment finance (TIF) revenue, which the DDA is authorized to capture under state statue.

The project was recommended by the DDA’s operations committee. The board vote was unanimous.

This brief was filed from the DDA offices, 150 S. Fifth Ave., Suite 301, where the DDA board holds its meetings.

Ann Arbor LDFA Looks to Extend Its Life

Ann Arbor Local Development Finance Authority board meeting (June 17, 2014): The LDFA board’s meeting convened around 8:20 a.m. – about seven hours after the city council’s meeting adjourned the previous evening. And the council’s meeting was the topic of small talk among LDFA board members as they waited for their meeting to convene.

Carrie Leahy is chair of the LDFA board.

Carrie Leahy is chair of the LDFA board.

The council’s meeting was of more than just passing interest to the LDFA board members – because the council voted at that meeting to table a $75,000 contract for business development services with Ann Arbor SPARK, a local nonprofit economic development agency. Ann Arbor SPARK is also the LDFA’s contractor – but not for the same kind of services that SPARK delivers under its contract with the city. The council will likely take up its contract with SPARK again at a future meeting, possibly as soon as July 7.

The city’s annual contract with SPARK, which is paid for with general fund money, is meant to cover the attraction and retention of mature companies to the Ann Arbor area. In contrast, the LDFA contracts with SPARK for entrepreneurial support services – for companies that are in some phase of starting up.

On the LDFA board’s June 17 agenda was the annual contract with Ann Arbor SPARK for entrepreneurial support services – which the board voted to approve. This year that contract is worth nearly $2 million – $1,891,000 to be exact.

An unsuccessful bid by councilmembers made during the city’s FY 2015 budget deliberations would have reduced the total LDFA expenditures by $165,379. The goal of that expenditure reduction would have been to increase the fund balance that was available for infrastructure improvements in the LDFA district – specifically, for high-speed telecommunications. At the LDFA’s June 17 meeting, city CFO Tom Crawford indicated that sometime in the FY 2015 fiscal year, the city would be making a proposal to install fiber throughout Ann Arbor.

The contract between the LDFA and SPARK covers a range of items, with the top two line items consisting of staffing for the business incubator ($420,000) and provision of services to start-up companies in Phase III of their development ($550,000). SPARK classifies its engagement with companies in terms of phases: preliminary screenings (Phase I); due diligence (Phase II); intensive advising (Phase III); and accelerating opportunities (Phase IV). [.pdf of FY 2015 budget line items] [.pdf of LDFA-SPARK FY 2015 contract]

At its June 17 meeting, the LDFA board also approved a routine annual $42,600 contract with the city of Ann Arbor – for administrative support services. Those include items like the preparation of meeting minutes, stewardship of public documents, and preparation of budgetary analyses. [.pdf of FY 2015 LDFA contract with city of Ann Arbor]

The final voting item for the board was approval of its meeting schedule for the next fiscal year. The LDFA board meets in eight out of 12 months, with the next meeting taking place on July 15, 2014, starting at 8:15 a.m. in the city council chambers. [.pdf of 2014-2015 meeting schedule]

These voting items did not, however, generate the majority of the board’s discussion at its June 17 meeting.

The board focused most of its discussion on issues surrounding its application for an extension of the LDFA past its current 15-year lifespan, which ends in 2018. Legislation passed in 2012 allowed for either a 5-year or a 15-year extension – with different criteria for those time periods. The 15-year extension requires an agreement with a satellite LDFA, with two communities currently under consideration to partner with Ann Arbor’s LDFA: Brighton and Adrian. Flint had also been a possibility, but is no longer on the table.

With an extension, the LDFA would continue to capture school operating millage money, which would otherwise go to the state’s School Aid Fund. At least some of the school taxes subject to capture by LDFAs statewide are required to be reimbursed to the School Aid Fund by the state. Questions about how that applies to Ann Arbor’s LDFA have been raised – and a review of the state statute appears to support the conclusion that the key clause requiring reimbursement is inapplicable to the Ann Arbor SmartZone LDFA. That understanding was confirmed to The Chronicle by the Michigan Dept. of Treasury communications staff in a telephone interview on June 23.

The exact nature of that tax capture arrangement and possible reimbursement was also the subject of LDFA board discussion on June 17 – because the LDFA board is being pressed by city councilmembers to account for how the LDFA tax capture impacts the state’s School Aid Fund. Board member Stephen Rapundalo expressed some frustration about that – based on his perception that this material had been well explained in the past: “What’s it take – for them to understand unambiguously how that works? I mean, we have told them. Why is the onus on the LDFA to have to show them that?”

Besides the tax capture mechanism, two other issues raised by city councilmembers are factoring into the LDFA board’s approach to seeking an extension of its term. Board chair Carrie Leahy told her colleagues that she took away two main messages from recent appearances in front of the Ann Arbor city council. Some councilmembers, she said, would like to see: (1) an independent audit of job creation numbers; and (2) a provision for infrastructure investments as part of an LDFA extension.

On the infrastructure side, the LDFA board’s discussion focused on the existing TIF (tax increment finance)/development plan, which provides for investments in high-speed telecommunications (fiber) networks, but not for projects like street construction, sewer construction and streetlight installation. The question was raised as to whether the LDFA could use its school tax capture to pay for a fiber network in the whole geographic district of the LDFA – or if school taxes could only be used to fund a fiber network to an business incubator.

The Ann Arbor LDFA’s district covers the geographic areas of the Ann Arbor and Ypsilanti downtown development authorities – although Ypsilanti’s DDA area does not generate any LDFA tax capture. As a consequence, money captured by the LDFA is not spent in the Ypsilanti portion of the district. But that could change under an extension of the LDFA – based on board discussion at the June 17 meeting.

On the job creation numbers audit, the June 17 board discussion indicated that the LDFA will now be looking possibly to incorporate a job numbers audit as part of an upcoming financial audit. The financial auditing firm will be asked to provide some explanation of how it might be able to incorporate a jobs audit as part of its scope of work for the upcoming financial audit. The board appears to understand that some type of jobs audit would be important for winning ultimate city council support for a 15-year extension of the LDFA.

The city council’s representative to the LDFA board, Sally Petersen, made that explicit more than once during the June 17 meeting, saying that “taking the lead on establishing an independent audit would go a long way towards getting city council support for an extension.”

The LDFA’s deliberations and other agenda items are reported in more detail below. [Full Story]

Ann Arbor OKs LED Streetlight Conversion

A purchase agreement with DTE – to convert 223 mercury-vapor cobrahead streetlights to LED technology – has been approved by the Ann Arbor city council. The up-front cost of the conversion will be $69,555 – but that amount will be reduced to $55,060 after rebates.

The annual electric bill from DTE for the 223 streetlights is currently $45,128. After conversion, the projected annual cost will be $30,910. The savings would result in about a 3.1-year payback period on the net cost of $55,060. City council action came at its June 16, 2014 meeting.

The city is billed for 7,431 streetlights – of which 5,216 are DTE-owned. Of the 2,215 city-owned lights, 1,923 have LED fixtures.

None of the streetlights to be converted under the … [Full Story]

Connection Fee Study OK’d

A $62,800 contract has been approved with Black & Veatch Ltd. covering a water & wastewater system capital cost recovery study for the city of Ann Arbor. The city council’s action came at its June 16, 2014 meeting.

Background to this contract was a June 3, 2013 city council action to change the calculation of the water and sanitary improvement charges for properties connecting to city water mains or sanitary sewers – but only for a two-year period, from July 1, 2013, through June 30, 2015.

The effect of the council’s action was to reduce the connection charges considerably. It was understood at the time that the two-year period would allow for the hiring of a consultant to review the city’s … [Full Story]

Council Rejects City Hall Renovation

The Ann Arbor city council has passed a resolution that asks the city planning commission to remove a “reskinning” project for the city hall building from the capital improvements plan (CIP) for FY 2017 and FY 2018. The vote came at the council’s June 2, 2014 meeting, over dissent from Margie Teall (Ward 4).

The item had been postponed from the council’s May 19, 2014 meeting.

According to a staff memo written in response to a councilmember question, reskinning of the Larcom City Hall building would mean replacing the existing exterior walls and windows of the building. The result would be new squared-off exterior, eliminating the inverted pyramid design. The new exterior would hang vertically from the sixth floor.

The focus of … [Full Story]

Library Board Acts on Budget, Infrastructure

Ann Arbor District Library board meeting (May 19, 2014): Trustees approved the library’s 2014-15 budget with no increase in the tax rate, following a pattern they’ve established over the past several years.

Ed Surovell, Margaret Leary, Ann Arbor District Library, The Ann Arbor Chronicle

Ann Arbor District Library trustees Ed Surovell and Margaret Leary at the board’s May 19, 2014 meeting. (Photos by the writer.)

The rate of 1.55 mills is also lower than the 1.92 mills that the library is authorized to levy. The $12.568 million budget assumes a 2.4% increase in tax revenues, based on an increase in property values. No one spoke during a public hearing on the budget that was held during the May 19 meeting.

The budget includes a 3% raise for AADL director Josie Parker, increasing her current salary of $143,114. As part of an annual director’s evaluation, board president Prue Rosenthal read aloud a letter from the board that praised Parker for her work and accomplishments.

Related to infrastructure, trustees authorized Parker to negotiate with Ann Arbor-based O’Neal Construction Inc. for work related to the downtown library entrance. O’Neal would be contracted to provide construction management services for the entrance’s renovation. This is the next step in a process that began several months ago, with construction to begin this summer.

The board also got an update from Parker about the public elevator for the downtown library, which is out of service. It’s expected to cost about $100,000 to repair and will take several months to fix. That work will also take place this summer, and requires closing the lower level of the building, where many public events are held.

The May 19 meeting included approval of contracts for janitorial services and HVAC maintenance, for three-year periods. Also approved was the renewal of a space-use agreement with the nonprofit Friends of the Ann Arbor District Library. FAADL operates a bookstore at the downtown library, with proceeds given to AADL.

The board also got a monthly update on library statistics, “top Tweets” and a viewing of a new video to promote AADL’s summer game, which starts on Friday, June 13, and runs through Sunday, Aug. 31. The video was produced by AADL staff and 7 Cylinders Studio. [Full Story]

Fifth & William

Public elevator for the four-story downtown library is out-of-service indefinitely. Report at library board meeting indicates it will be several months before a new elevator is installed – maybe by August – and will cost about $100,000. [photo]

Library Entrance Project Takes Next Step

The Ann Arbor District Library board has authorized the library director to negotiate with O’Neal Construction Inc. for work related to the downtown library entrance. The action came at the board’s May 19, 2014 meeting.

O’Neal would be contracted to provide construction management services. This is the next step in a process that began several months ago.

At the board’s April 21, 2014 meeting, the board had authorized the library director, Josie Parker, to hire a construction manager for the project. Board members also allocated $18,580 from the fund balance to pay InForm Studio for construction documents. InForm Studio, the architecture firm that previously designed AADL’s Traverwood branch, gave an update on the process at that same meeting.

The existing teal porcelain panels that … [Full Story]

DDA OKs $5M Budget for Parking Renovation

The Fourth & William parking structure in downtown Ann Arbor could undergo substantial renovations as a result of Ann Arbor Downtown Development Authority action taken at the board’s May 7, 2014 meeting.

Image from preliminary drawings by the Carl Walker design team for renovated elevator and stair tower for the Fourth & William parking structure.

Image from preliminary drawings by the Carl Walker design team for renovated southwest elevator and stair tower for the Fourth & William parking structure.

The board voted to establish a project … [Full Story]

Play, Work Items OK’d for Ann Arbor Parks

Three Ann Arbor parks will be receiving upgrades to play equipment, and all of them will have better equipment for mowing and snow removal as a result of city council action on May 5, 2014.

The council approved a contract with Game Time c/o Sinclair Recreation for $132,000 to improve facilities at three parks. Arbor Oaks Park and Scheffler Park will have their play structures replaced, and North Main Park will be getting a tire swing and chess table.

[Full Story]

Sidewalk, Street Repair Contracts Approved

Contracts related to Ann Arbor’s annual sidewalk maintenance and repair program, as well as for the annual street resurfacing program, have been approved in action taken by the city council at its April 7, 2014 meeting.

A sidewalk marked with a "C" – which indicates it needs to be cut flush – on Fifth Avenue south of William Street.

A sidewalk marked with a “C” – which indicates that it needs to be cut flush – on Fifth Avenue south of William Street.

The sidewalk … [Full Story]

Redesign Planned for Library “Front Porch”

Ann Arbor District Library board meeting (Feb. 17, 2014): Work on a significant redesign to the front entrance of the downtown Ann Arbor library is moving forward, following action this month by the AADL board.

Ann Arbor District Library, InForm Studio, The Ann Arbor Chronicle

Rendering of proposed new entry at downtown Ann Arbor library, located at 343 S. Fifth Ave. (Image by InForm Studio.)

A vote to continue with the project followed a presentation by Cory Lavigne of InForm Studio, the architecture firm that previously designed AADL’s Traverwood branch. A final design will likely be brought forward for approval at the board’s April 21 meeting, after a public forum in mid-March. Update: The forum is scheduled for Thursday, March 13 at 5:30 p.m. at the downtown building.

The entrance would continue to be oriented to South Fifth Avenue, with new doors into the building. The plan described by Lavigne includes replacing the existing teal strip that wraps around the front of the building – above the doors and windows – with a “concrete skin” panel. Wood paneling would be used in the ceiling of the outside walkway adjacent to the building. Sloping entry walkways would be located on the north side from the Library Lane parking structure and on the south side from William Street, with steps in front leading to South Fifth Avenue. Additional elements include landscaping, a bench, handrails and other features that visually link the library to the adjacent city-owned Library Lane.

The north side of the front facade, closest to Library Lane, would also include a large, translucent sign – made of glass or cast resin – that would be placed between existing brick columns, creating a screen along part of the walkway on that side of the building. The sign would be lit from the inside, with additional lighting along the walkway, to create a glowing effect.

It was that sign element that drew some criticism and concern at the board’s Feb. 17 meeting, primarily from Ed Surovell. He cautioned against creating any kind of shelter, saying it would simply be “an inviting nuisance.” AADL director Josie Parker acknowledged the concern, saying that she had discussed the issue with the library’s security staff as well. She told the board that no matter how the area is designed, security issues will always be a factor and would be handled as they are now, by security staff.

In other action at the board meeting, trustees approved revisions to more than a dozen sections of the AADL policy manual, and voted to create a new committee to help develop the next strategic plan, for 2015-2020. That planning effort had been the focus of a Feb. 3, 2014 board retreat.

Board members also got a brief update on the agreement for a new bike share program called ArborBike, which trustees will likely be asked to approve at their March 17 meeting. It relates to a bike station that will be located on the northern end of the downtown library’s property.

During her director’s report, Josie Parker told the board that the downtown library will be a site for the Living Lab Initiative, a project funded by the National Science Foundation. AADL will be the first public library to be involved in this project, and researchers will be working in the youth department through the end of September.

The board also heard from two people during public commentary: Changming Fan of TiniLite World Inc., who expressed interest in working with the library; and Jamie Vander Broek, a University of Michigan librarian and homeowner who described several reasons why she appreciated AADL. She concluded her remarks by saying: “I love paying my taxes for this library.” [Full Story]

New Entrance Planned for Downtown Library

Plans for a major redesign to the exterior front entrance of the Ann Arbor District Library’s downtown building at 343 S. Fifth Ave. will move forward, following approval by the AADL board at its Feb. 17, 2014 meeting.

Ann Arbor District Library, The Ann Arbor Chronicle

Rendering of new entrance design for the downtown location of the Ann Arbor District Library.

The vote followed a presentation of the redesign by Cory Lavigne of InForm Studio, which is handling the project. The architecture firm designed AADL’s Traverwood branch. A final design will likely be brought forward for approval at the board’s April meeting, following a public forum in mid-March.

The entrance … [Full Story]

Ann Arbor Reports South Industrial Sewer Overflow

The city of Ann Arbor has announced that a sanitary sewer overflow took place on Jan. 28, 2014. According to a press release on the city’s website, the overflow was caused by the break of a 16-inch water main on South Industrial Highway, which caused a nearby sanitary sewer line to break.

Untreated water from the broken sanitary sewer line flowed up to the street via manholes, according to the press release. The untreated water then made its way into the city’s stormwater system, to Malletts Creek and, ultimately, to the Huron River. A report has been made to Michigan Dept. of Environmental Quality about the incident, according to the city.

In a conversation with The Chronicle last week, public services area … [Full Story]

DDA Acts on Elevator Design, Parking Term

Ann Arbor Downtown Development Authority board meeting (Jan. 8, 2014): In a meeting that lasted just 40 minutes, the DDA board handled two substantive items of business: funding for design work of a new parking structure elevator; and extension options for monthly parking permits associated with a planned new residential development.

Floor 7 at the southwest elevator of the Fourth & William parking structure in downtown Ann Arbor.

Floor 7 at the southwest elevator of the Fourth & William parking structure in downtown Ann Arbor. (Photos by the writer.)

The elevator in question is located at the southwest corner of the Fourth & William parking structure. The 994-space capacity makes it the largest structure in Ann Arbor’s public parking system, which offers around 8,000 parking spaces in lots, structures and on-street, metered parking.

The elevator is at least 30 years old, and was characterized at the meeting by DDA executive director Susan Pollay as one of the slowest in the Ann Arbor area, and the frequent subject of parking patron complaints. A trip from street level to floor 7 was timed by The Chronicle at about 45 seconds. That compares to 17 seconds for a similar trip on the elevator at Fourth & Washington, which is the DDA’s second-newest structure.

The board’s Jan. 8 resolution authorized $40,000 for Carl Walker Inc. to develop architectural renderings for the work at the Fourth & William parking structure. Carl Walker is the consulting firm used by the DDA for its routine maintenance inspection program for the parking structures. The design is supposed to allow for phased construction so that the parking structure could remain open during the construction period, which would not begin before next winter. The estimated construction cost for the project is $2.25 million.

In its other main business item, the board voted to allow the developer of the future 624 Church St. project in downtown Ann Arbor to extend for up to 15 years – for a total of 30 years – the contracts for 48 already-approved parking permits under the city’s contribution-in-lieu (CIL) program. At its meeting on Nov. 6, 2013, the DDA board had already approved the purchase of 48 parking permits through that CIL program for a new version of the proposed residential development at 624 Church St. in downtown Ann Arbor.

The spaces were approved to be provided in the Forest Avenue parking structure. The DDA board’s Jan. 8 resolution indicated that for the extension periods, the DDA might choose to allocate the spaces in some other structure than the Forest facility.

In an update at the meeting also related to parking, city administrator Steve Powers said that the surface parking lot at the former Y site would need to be closed no later than March, due to the sale of the city-owned property to Dennis Dahlmann. The property is located on the north side of William Street, between Fourth and Fifth avenues near the Blake Transit Center and downtown library.

The board also received an update on its initiative to pay for downtown ambassadors. And board members were alerted to the upcoming Jan. 13 city council work session about economic development. [Full Story]

Red Oak & Mixtwood

City crews labor into the night at a water main break, one of three in the city right now, according to one of the workers. [photo]

Fourth & William Parking: Design for New Elevator

Preliminary design work costing $40,000 for a new elevator and stair tower on the southwest corner of the Fourth & William parking structure has been authorized by the Ann Arbor Downtown Development Authority board.

Fourth & William parking structure elevator tower

Fourth & William parking structure elevator/stair tower on Jan. 7, 2013. (Photo by the writer.)

The board’s action to task Carl Walker Inc. to develop architectural renderings for the work at the Fourth & William parking structure came at the board’s Jan. 8, 2014 meeting. The funds for the design work would be drawn from the parking fund, not the DDA’s tax increment finance (TIF) revenue.

The Fourth & William parking … [Full Story]

Recommendations Set for Downtown Zoning

Ann Arbor planning commission meeting (Dec. 3, 2013): Following months of public input and review by a consultant hired by the city, Ann Arbor planning commissioners finalized a set of recommendations to revise parts of the city’s downtown zoning. Those recommendations will now be forwarded to the city council, possibly at its Jan. 20 meeting.

Bonnie Bona, Wendy Rampson, Ann Arbor planning commission, The Ann Arbor Chronicle

From left: Ann Arbor planning commissioner Bonnie Bona talks with city planning manager Wendy Rampson before the start of the commission’s Dec. 3, 2013 meeting. Bona was successful in advocating for the downzoning of a parcel at the southeast corner of Main and William. (Photos by the writer.)

In general, the recommendations aim to create more of a buffer between downtown development and adjacent or nearby residential neighborhoods.

Three of the recommendations relate to specific parcels: (1) Rezone the parcel located at 336 E. Ann from D1 (downtown core) to D2 (downtown interface); (2) Reduce the maximum height in the East Huron 1 Character District (on the north side of Huron, between Division and State) to 120 feet. Include a tower diagonal maximum and consider a step-back requirement to reduce the shading of residential properties to the north; (3) Rezone the parcel at 425 S. Main, at the southeast corner of Main and William, from D1 (downtown core) to D2 (downtown interface) and establish a maximum height of 60 feet for D2 zoning in the Main Street Character District.

Several other recommendations focused on the issue of “premiums” – certain features that a developer can provide in exchange for additional square footage. Those recommendations are: (1) Revise the premium conditions to require mandatory compliance with core design guidelines for a project to receive any premium in the D1 or D2 districts; (2) Reduce the residential premium with the goal of encouraging the use of other existing or proposed premiums to compensate for this reduction, such as increased energy efficiency certification, open space with landscape, active ground floor use, balconies and workforce housing; (3) Review options in D1 and D2 districts, with the housing and humans services advisory board (HHSAB), for providing additional affordable housing within mixed income projects or through other funding mechanisms; (4) Eliminate the affordable housing 900% FAR (floor area ratio) “super premium”; and (5) Evaluate the downtown real estate market to determine the effectiveness of premium incentives every 2-5 years.

On Dec. 3, commissioners heard from three people during the public hearing – all three of them addressing the issue of zoning at 425 S. Main, including one of the property owners, Andy Klein. Speaking on behalf of the owners was Scott Bonney of Neumann/Smith Architecture, who suggested a third option to consider: Keep the D1 zoning on that site, but reduce the maximum height to 122 feet and add a tower diagonal maximum of 50% of the maximum diagonal dimension of the site. Ted Annis, who lives near that location, called for D2 zoning there.

Bonnie Bona, who’d been involved in the original A2D2 zoning process that’s now being partially reviewed, advocated for downzoning the entire site at 425 S. Main, to provide a buffer between D1 zoning and the nearby residential neighborhood. Some commissioners, including chair Kirk Westphal, wanted more density in the downtown, and noted that the site has allowed for denser development since the 1960s. The final vote on the recommendation for that site was 5-4, with support from Bona, Eleanore Adenekan, Sabra Briere, Jeremy Peters and Wendy Woods. Voting against it were Westphal, Ken Clein, Diane Giannola and Paras Parekh.

Also, because of feedback received from the city’s design review board, commissioners revisited a recommendation that they’d previously settled regarding compliance with design guidelines. They unanimously voted to change the recommendation – so that it would require mandatory compliance with some of the design guidelines. The intent is to develop a process that will clarify the design compliance that will be required in order to receive premiums.

The vote on the full resolution with all of the recommendations, as amended, passed unanimously.

The next step is for the council to review the recommendations and give direction back to the commission about which recommendations to implement. At that point, the commission’s ordinance revisions committee would work with city planning staff to craft actual ordinance language. Any specific ordinance changes would be reviewed by the full planning commission and ultimately would require city council approval before taking effect. That process would include additional opportunities for public input.

Also on Dec. 3, commissioners reviewed the 2015-2020 capital improvements plan (CIP). After about an hour of discussion – touching on street lights, sidewalks, the rail station, public engagement, and other issues – they voted unanimously to adopt the updated CIP as a supporting document for the city’s master plan, and to recommend that the city council base its FY 2015 capital budget on the CIP.

The CIP includes a list of major capital projects, both those that are funded and those for which funding hasn’t yet been identified. [.pdf of staff memo and CIP for FY 2015-2020] Most of the updates relate to FY 2015, which begins on July 1, 2014. This year reflects the first-time inclusion of projects undertaken by the Ann Arbor Downtown Development Authority and the Ann Arbor housing commission. [Full Story]

Action on County Infrastructure Projects

Two infrastructure projects – in Dexter Township and Freedom Township – were supported with actions by the Washtenaw County board of commissioners at its Dec. 4, 2013 meeting.

The board authorized issuing up to $460,000 in bonds for the Copper Meadows drain project in Dexter Township, northwest of Ann Arbor. The drain is located in the Copper Meadows subdivision off of North Territorial Road, near the Dexter town hall. The bonds would be repaid with special assessments on Dexter Township, Washtenaw County, and property owners in the drainage district. The first assessment would be levied in December 2014. [.pdf of staff memo on Copper Meadows project]

The board also passed a resolution that directs the county’s board of public works to … [Full Story]

Ann Arbor: “Sidewalks” Can Include Cross-Lot Paths

Cross-lot walkways in Ann Arbor will now be treated as “sidewalks” from the perspective of the city’s sidewalk repair millage. Even though the millage funds can now be used to repair the walkways, owners of property adjacent to cross-lot walkways will not bear responsibility for snow removal in the winter.

Cross-lot walkways include those that connect streets to parks or school property, or connect two parallel streets.

For typical sidewalks along the side of streets, Ann Arbor’s ordinance requires the adjoining property owner to take responsibility for snow removal. That’s unchanged by the ordinance revision on cross-lot walkways.

The council’s final approval of the ordinance change came at its Oct. 21 meeting.

At its July 1, 2013 meeting, the council was set to give … [Full Story]

County Moves to Join Pittsfield State St. Project

The Washtenaw County board of commissioners has taken an initial vote to approve participation in Pittsfield Township’s State Street corridor improvement authority (CIA). The vote, taken after about a 90-minute debate at the board’s Oct. 16, 2013 meeting, was 8 to 1, with dissent from Dan Smith (R-District 2).

The resolution would authorize the county administrator to sign a tax-sharing agreement with Pittsfield Township and the State Street CIA, which is overseen by an appointed board. [.pdf of agreement] The agreement would allow the CIA to capture 50% of any county taxes levied on new development within the corridor boundaries, not to exceed $3,850,464 over a 20-year period, through 2033. The purpose is to provide a funding mechanism for … [Full Story]

Cross-Lot Paths as Sidewalks: Initial OK

Cross-lot walkways that aren’t located on the side of a street will likely be defined as “sidewalks” in the city of Ann Arbor – based on the initial approval of an ordinance change by the Ann Arbor city council on Oct. 7, 2013.

Elements of the ordinance change would: (1) allow such cross-lot paths to be repaired with funds from the city’s sidewalk repair millage; and (2) not trigger the winter maintenance requirement for adjacent property owners.

Under the city’s current ordinances, if an existing walkway meets the definition of a “sidewalk,” then the city bears responsibility for its repair for the duration of the sidewalk repair millage – which was approved by voters in November 2011 for a five-year period. But … [Full Story]

Sidewalks: Repair, Build, Shovel

Local government doesn’t get more pedestrian than sidewalks.

Sidewalks

Top: Example of a cross-lot walkway, leading from street to school. Middle: Sidewalk that was cut flush funded by the city’s sidewalk repair millage. Bottom: Recommended detention ponds in Eisenhower Park near the proposed Scio Church sidewalk.

Yet these existing and future slabs of concrete are themselves a constant topic of confusion and controversy: Who’s responsible for repairing the busted slab in front my house? Who’s supposed to shovel snow off the sidewalk in the winter?

Sidewalks also connect up to other equally important if also dull components of local governance – like stormwater management and public art.

So here’s a quick rundown of some specific sidewalk-related issues that the Ann Arbor city council will be considering.

The council’s agenda for Monday, Oct. 7, includes an item on the definition of sidewalks. If an existing walkway meets the definition of a “sidewalk,” then the city bears responsibility for its repair for the duration of the sidewalk repair millage. All other things being equal, the adjacent property owner would be responsible for snow removal in the winter.

The Oct. 7 agenda item focuses on walkways that aren’t really on the “side” of anything – walkways that connect a street to a park or school, or that connect two parallel streets. The city calls them “cross-lot” walkways. If such walkways were added into the definition of “sidewalk” – as the city council is contemplating – then the city would be responsible for repair. That’s a result welcomed by property owners. But it would put the burden for snow removal on those property owners – a less welcome result. That was the sentiment that led the council to postpone final consideration of a change to the definition of “sidewalk” three months ago, on July 1, 2013.

So on Oct. 7, the council will be asked to consider a different approach to that definitional change – one that would allow the so-called “cross-lot” paved pathways to qualify as sidewalks under the city’s ordinance, but not trigger a winter maintenance requirement for adjacent property owners.

The fresh look would mean that the council’s possible action on Oct. 7 would be considered only an initial approval of the ordinance change. Final enactment of the change would require a second vote at a subsequent council meeting. If approved, the ordinance would allow cross-lot paths to be repaired under the city’s sidewalk repair program – funded through the five-year millage approved by Ann Arbor voters in November 2011. That program is noticeable to residents in the form of pink markings that appear on sidewalk slabs – an “R” for replace and a “C” for cutting an out-of-alignment section so that it lines up flush with the next slab.

The millage can pay for repair or replacement of existing slabs of sidewalks, but not for the construction of new sidewalks. So that millage money isn’t available to build a new stretch of sidewalk along the south side of Scio Church Road (or to fill in a smaller gap on the north side) – a section of sidewalk that residents have petitioned the city to build. The petition for a sidewalk there is based on several considerations, including a desire to connect to amenities west of I-94, like the Ice Cube, Wide World of Sports and the Ann Arbor District Library’s Pittsfield branch. It’s also seen as a pedestrian safety issue, because the lack of a sidewalk on one side of the road could induce pedestrians to cross the road at places where motorists don’t expect pedestrians to cross.

The city council authorized $15,000 of general fund money for the study of alternatives along that stretch – alternatives that were presented at a meeting held on Sept. 18 at Lawton Elementary School and attended by about two dozen people. Next up for the city council, likely on Oct. 21, will be a request for a design budget, so that costs of the project can be estimated with more precision.

Among the alternatives that were considered, but not pursued in much detail, was construction of a pathway through Eisenhower Park. That’s where the Washtenaw County water resources commissioner is now recommending that a pair of detention ponds be constructed – to help mitigate overland flooding in the area. That recommendation was presented to a group of about 80 neighbors on Sept. 30 – also held at Lawton Elementary School.

And a fence that that might need to be constructed along the proposed Scio Church sidewalk – to prevent people from falling down the steep incline – received a glancing mention at a recent meeting of the Ann Arbor public art commission. A proposal to fund a public art project that would be integrated into the fence was tabled by the commission at its Sept. 25, 2013 meeting. [Full Story]