Jim Fackert is working on the guts of the rainwater drainage system that’s connected to the Dreiseitl water sculpture. He has opened up a grate and is cleaning out the drain in preparation for turning on the water flow to the sculpture. That will likely happen early next week.
City Hall
![Stopped. Watched. icon](http://annarborchronicle.com/wp-content/themes/chronicle/images/observed.jpg)
» Want more items like this one? Visit the Stopped. Watched. page.