City Hall

Stopped. Watched. icon

Jim Fackert is working on the guts of the rainwater drainage system that’s connected to the Dreiseitl water sculpture. He has opened up a grate and is cleaning out the drain in preparation for turning on the water flow to the sculpture. That will likely happen early next week.

» Want more items like this one? Visit the Stopped. Watched. page.