Presentation on WALLY Ann Arbor downtown station locations from SmithGroupJJR. Lots of interaction from crowd of about 25 (not including various staffs). Presentation will be available in a few days at wallyrail.org (currently bumps to AAATA site). Used 3 criteria to identify 5 alternative sites for a 645 ft footprint. Several wildcards include need for layover location (4 trains will stay in Ann Arbor until return trip to Howell).
Main & Summit

» Want more items like this one? Visit the Stopped. Watched. page.